500 Tons Overhead Crane
500 tons Overhead Crane 500 ton overhead crane usually refers to double girder bridge crane, which is a kind of bridge crane. Compared with the single-girder crane, the double-girder crane has a larger lifting load and stronger applicability, but at the same time, the cost is also higher and the...
- Cludo Cyflym
- Sicrwydd Ansawdd
- Gwasanaeth Cwsmer 24/7
Cyflwyniad Cynnyrch
500 tons Overhead Crane
500 ton overhead crane usually refers to double girder bridge crane, which is a kind of bridge crane. Compared with the single-girder crane, the double-girder crane has a larger lifting load and stronger applicability, but at the same time, the cost is also higher and the self-heaviness is larger.

1. Lifting capacity: 5-32/5t (can be customized according to actual requirements)
2. Span: 10m-35m (can be customized according to actual requirements)
3. Lifting height: can be customized according to actual requirements
4. Cart speed: 40-90m/min (can be selected according to needs), trolley speed: 40m/min
5. Hoisting speed of main hook: 12.5m/min
6. Car track: 38, 43, 50kg/m (determined by tonnage and span)
7. The working level is A5-A8
8. Working environment temperature -25 degree -40 degree

How to standardize the maintenance of 500 ton overhead crane and prolong its service life?
1. Daily maintenance
Ensure the cleanliness of the 500 ton overhead crane equipment, electrical appliances, and other parts; check the bolt connection of each equipment, and reinforce loose parts in time; ensure the lubrication of each part, especially the lubrication of metal components; check the temperature and operation of the motor, gearbox and other components to ensure that the motor does not exceed 80% of the rated problem during operation, etc.
2. Maintenance of lifting mechanism
Do a good job of cleaning the hook and wire rope of the 500 ton overhead crane, add lubricant in time, and check and maintain frequently. Strictly follow the safety regulations of crane equipment, check whether the equipment meets the safety technical requirements, and test whether the performance is normal.
3. Maintenance and maintenance of transmission and walking mechanism
Focus on whether the electric motor of the crane has water or oil ingress, daily prevention and treatment; ensure that the observation hole and junction box cover of the motor are tight, and the operation is required to be no less than 85% of the rated voltage.
Note that the wear of the wheel rim of the crane should not exceed 50% of the original thickness. During daily inspection and maintenance, serious wear and tear should be replaced in time.
In addition to daily maintenance, the 500 ton overhead crane also needs to be maintained on a monthly and quarterly basis to ensure normal use quality and prolong the service life.
In different environments, the types of cranes used are different, such as slow speed, explosion-proof, insulation, electromagnetic, grab, double trolley, dual-purpose, three-purpose, etc., if necessary, please consult the crane.
Tagiau poblogaidd: 500 tons overhead crane, China 500 tons overhead crane suppliers, manufacturers, factory
na









